Permission for mining or working of minerals
Mineral resources are natural concentrations of minerals or aggregates that, due to their inherent properties, are of potential economic value through mining and extraction. They are essential raw materials, upon which manufacturing, construction and agriculture rely.
In the UK, ‘minerals’ are defined in planning legislation as ‘all substances in, on or under land of a kind ordinarily worked for removal by underground or surface working, except that it does not include peat cut for purposes other than for sale.’
Schedules 5 and 9 of the Town and Country Planning Act 1990 establish a range of orders for mineral planning authorities to control minerals development.
The working of minerals can only take place if the operator has received both planning permission and any other relevant permits and approvals. These include permits from bodies such as the Environment Agency, licenses from Natural England, and so on.
There are a number of planning matters specific to the supply of minerals:
Firstly, minerals are only capable of being worked (i.e. extracted) in the place where they naturally occur in the sufficient quantity and of the desired quality, which means that there may be limited locations where economically viable and environmentally acceptable works can take place. This may impact on the permissions given to non-mineral development in areas where there are minerals, such as a defined mineral safeguarding area.
Permission often makes clear that the working of minerals is a temporary land use, albeit one that can take place over a long period of time. The fact that some minerals permissions can last for many years makes it necessary to carry out periodic reviews of the planning conditions attached to the relevant permission. This can help ensure that sites continue to operate in accordance with working and environmental standards.
Permissions are often given on the proviso that routine monitoring will take place, and permissions may stipulate that the land should be restored following working, to make it suitable for beneficial after-use. An example of this is the Eden Project in Cornwall, where a national educational and tourism resource was developed on the site of a former china clay pit.
In England, the key national planning policies for minerals are set out in the National Planning Policy Framework (NPPF), which aims to balance the sufficient supply of minerals with safeguarding against unacceptable adverse impacts.
In Wales, the land use planning policies for minerals are contained in the Planning Policy Wales, and supported by a series of Minerals Technical Advice Notes (MTANs).
In Scotland, mineral policies are contained in Scottish Planning Policy (SPP).
In Northern Ireland, policy and guidance is provided through the Strategic Planning Policy Statement for Northern Ireland (SPPS).
A Mineral Planning Authority (MPA) is a local authority with responsibility for mineral planning and for making permissions decisions. An MPA is the county council (in England, where there are two tiers of local government), the unitary authority, or a national park.
MPAs can plan for the steady and adequate supply of minerals by:
- Designating specific sites where development is likely to be acceptable in terms of planning and where landowners are supportive.
- Designating preferred areas where planning permission might reasonably be anticipated.
- Designating areas of search where the availability of mineral resources may be less certain but where planning permission may still be granted.
[edit] Related articles on Designing Buildings Wiki
- Development consent order.
- Dredging.
- Environmental Impact Assessment.
- Gypsum.
- Mineral planning authorities.
- Mineral safeguarding area.
- Minerals of local and national importance.
- National planning policy framework NPPF.
- Planning permission.
[edit] External resources
- BGS - Minerals UK
Featured articles and news
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.